You are currently browsing the tag archive for the 'stairs' tag.

We’re getting so close.  This past weekend Sean and I hung the cabinets This Old House style and thanks to our neighbor Al, the counters are also installed in the kitchen.  Everything is farm house straight:

Kitchen cabinets up

We also spent a day attending to the yard and putting away materials in preparation for some more excavating work.  We are extending our driveway along the house and adding gravel as well as preparing the site for our garage to be built next year.  As it turns out, we are also having our septic repaired. (Sigh.)  

The project list is shrinking, and we’re feeling the pressure to get the rest of it done… yesterday.

We need some help. 

I didn’t have the walls ready to paint this past weekend because I’ve damaged my wrist (at least temporarily) from mudding and sanding.  I’m going to keep it wrapped and pop lots of ibuprofen this week and do my best to finish the last coats of mudding in the living room, stairway, and one more bedroom so that all remaining rooms are ready for sanding and paint by Saturday. 

If I can hang on and push one more week out of my arm,  maybe our sweet little C. will not have to finish the rest of it up for me:

C. is a helper

I’m feeling the burn to get this done.  Can you help us!?  For an hour?  Or four?

Needed this Saturday September 26th

  • Sanders (first thing Saturday morning!) and Dust Wipers
  • Wall Painters (I know you’re all out there!  About ninety-eight thousand people have approached me about helping with this in the past six months.  The time has finally come.)
  • Pressure-Washer Operator (for porch and window trim)
  • Cleaning Helpers (to bravely take on The Dust.  Vacuuming floors, walls, window sills; wiping cupboards, ceiling fans and light fixtures; washing  windows and screens, steam cleaning the couch… everything is filthy.  It just has to end.)
  • Child Care!  Okay A. and L. are too old to need this, but they are usually game for tagging along if you want to take the whole crew.  Especially if it means getting out of doing yard work or other manual labor on the house.  Or babysitting.
  • Meal Preparation and Cleanup.  Cook and serve food to our hardworking friends so that we don’t have to stop working except to stuff our faces! 
  • Roofer to finish installing ridge caps, top the chimney pipe and trim the valley shingle edges

Sean and I need to be able to finish installing floor transitions in two doorways and the wood treads and landings on the steps.  The idea is to be ready for floor finishing during the week of Sept. 28 – Oct. 2, and to forge ahead full steam…

Next Saturday, October 3

  • Exterior painters for porch and window trim
  • Interior trim installers
  • Gardeners/Grass planters
  • Closet organizer installer
  • Window insulator/sill-board installer/caulker
  • Child care helpers
  • Meal preparation and cleanup
  • BONFIRE ATTENDEES!  Yes, it’s time for a party.  We plan to burn a huge pile of brush and junk wood.  (And make merry drinking beer and pop and eating snacks. )  Fire starting around 7-8 PM.  Bring your own chair and a song in your heart.  Be sure to call us to let us know that you’re coming so that we can talk you into helping us at some point throughout the day too. 

If arrangements work out, carpet will be installed upstairs between Oct 5 and 9… and we’ll be ready for the last wave of help by…

October 10

  • LARGE ITEM MOVERS! The massively heavy couch (two recliners) is already moved, our giant living room armoire is sold and we are hiring out to move the piano…  (“You’re welcome,” to everyone who has ever helped us move!)   The bulk of what’s left will be managed in small bites as we go but we’ll need help with a few large items:  stove, washer, freezer, desk, dressers…

If you can help with any or all of it, I can’t even begin to tell you how deeply appreciated it would be!  We are SO aware that we can’t do it all alone.

 

Walls in stairway up

Windows in master bedroom installed

Walls up and mudded in C. and J.'s room

Over-john Cabinet Hung

Fridge in the Bathroom

Well, I realize I’ve disappeared from the blog world for awhile.

[Insert unnecessary apology here]

The progress on the house continues, although we are still living at our Spring Lake house.  (Otherwise known as the “Spring Lake Estate” …and when you say it, you must do your best impression of Thurston Howell III.)

When asked, “When will you be moving?”  our automatic response is: “Two weeks.”  We wanted to move before school started, but the first day of school photos took place on the front stoop here for the last time.

I’m going to cover updates a room or two at a time.  We’ve made so much progress!  Here’s C and J’s room, walls and insulation torn out:

C&J Room Walls Torn Out

Somehow, I haven’t snapped a photo of the completed sheetrock in the room.  Seams are even coated twice.  A quick touch up coat and some sanding, and it will be ready for paint and carpet.

The next shot is from the last day of roof replacement.  Going up the stairs, I could see right out the roof…

Pipes, open roof

Making pictures of our house is going to be decidedly more boring when all the walls are up.

Stairs, walls out in C&J's room

I’m a couple weeks behind posting photos.  It’s a good indication that I’ve been too busy working to work on blog posts!

Roof work with tractor

Brave guys on the old roof boards

Front main roof done

West side roof done

Mold abated, insulated stair hall

Gutted bedroom

Kitchen sheetrock

More to come from this past weekend!  Windows are going in…

More bits and pieces as we speed toward moving day.  I was looking at the calendar and realizing that we only have a month until our goal date.

I’ve had the inkling for awhile that we aren’t going to make that August 1 goal.  But it’s okay. I would prefer to be living in the new place when school starts, but even if we don’t make that goal, it will be okay.

We can stay in our current house through December for sure, and it’s looking  like that deadline may be extended to March 2010.

Reinforced header

The header has been reinforced…

Excavator

With Howard’s permission, the kids got to play in the large machinery.  Howard fashioned us a driveway!

Eventually, the garage will be built attached to the house, with bedrooms above it, we hope.  Doesn’t look like our initial budget will include enough to get it built this year.  So we’re looking into getting remote car starters for the winter instead…

Driveway

The next photo shows the path through the yard to the electrical pole.  We are having the lines buried along with our upgrade in service.

Path for the electrical line

Roof Day One

Work on the roof has officially started, one section at a time.  We are tearing off down to the roof boards–covered by layers of asphalt shingles and wood shakes–and putting all new plywood down.

To the left is my faithful and brave cousin Brian.  He’s up for anything.  I wonder if he knows how much we appreciate that.  And behind him, yes, that’s Sean on the roof.  (He hasn’t been cleared by the surgeon to go back to work yet.)  Our crazy friend Andy is taking a break and watching here, but don’t let it fool you.  He’s an animal when it comes to destruction.

I forgot to grab the camera the day that my cousin Neal joined the roofing crew.  After he took a tour of our place and came up from the basement, he made a comment that I loved.

He said that our house was just like all the cars he’s ever owned.  Crappy on the outside but totally rebuilt from within.

It made me smile, because it’s so true.  And it felt nice to hear the genuine acknowledgment of all the hard work we’ve done on the house’s systems.  So thank you for that Neal.

Little by little, we make progress in the bathroom as well.  Here’s the framing for the dropped ceiling above the shower.  It will make room for installing a vent and light as well as the dryer vent duct work:

Bathroom ceiling

Yes, it’s a toilet.  It even flushes.  Yes, it’s a door.  It opens and closes. The simple pleasures.

Yes, that’s a container of screws sitting on the toilet tank.

Bathroom door and toilet

Chad returned and worked his magic over the stairs:  No more heads bonking!  Woo hoo!

Headroom on the stairs

Stairs ceiling

Is is a secret passageway into the bedroom?  Or just a neat little slide?

A slide for the little kids

My sister Becca and I had such a fun email exchange last week.  She asked how Sean was recovering from knee surgery (they scoped him and removed some torn cartilage), and I told her that he was up and moving around without crutches.

I was worried that he would push himself too quickly and that recovery would take even longer.  I went on to describe the many ways that our house projects are gaining momentum and all the different people who are helping us make it happen.

She has been renting the Little House on the Prairie series for her girls and my comment reminded her of the episode where Pa breaks a rib and has to finish stacking the bags at the mill to pay the mortgage. Mary and Laura try to do it for him, but of course the men of the town swoop in and stack the bags and save the day.

I vaguely recall the episode… I remember the tape wrapped around Pa’s ripped abs.  Well, maybe he wasn’t THAT ripped.

Anyway, she said that it sounds like our house project is coming together Walnut Grove style.

I like that.

I’m cheesy that way.

The latest project includes a new staircase to replace the steep farmhouse steps we ripped out last week.

Our skilled friend Chad brandished a tape measure, saw, and nail gun to make it happen.  It was amazing to witness the process.  It started with a TON of measuring and dividing and marking on the walls.  Apparently there are more rules for stairs than just about any other place in a house.  A few cuts into the first boards and we had a platform:

Platform for stairs

Once the boards dry out well and the roof is fixed to prevent more water (and the resulting mold) problems, we will be able to finish treating the mold, and then insulate and sheetrock the walls inside the staircase hall.

Here’s our hero of the day!  A million thanks Chad!  If anyone out there is looking for a contractor to hire for a remodel job, I know of a really great guy…

Chad at Work

We still need to cut into the ceiling to make more headroom.  For now, the opening is perfect for munchkins.

Lower half of stairs

C has decided that the platform is a stage.  What a surprise. Like mother, like daughter.

Touching the ceiling

There will be finished southern pine boards for the skirt along the wall and the edges of the steps, and we will install a carpet runner in the center of the steps.

Upper half of stairs, looking down

View from below stairs

Scrap wood

This last one makes me smile.

Geez, maybe someday we’ll look back at all this and say, “We were crazy.”

I’m sorta basking in it for the moment.

Bottom of the stairs

Lori peeking out from the stairs

Tile cutter

Craig and Sean on the stoop

Prizes

Prize Mania!  Thank you kids for picking up sticks!

Sarah Cady

Artist,

lover,

musician,

mother.

Flexible,

liberal,

passionate,

spiritual.

Writer,

thinker,

friend.

Archives

All text and images copyright Sarah Cady, 2007

 

November 2009
S M T W T F S
« Oct    
1234567
891011121314
15161718192021
22232425262728
2930